Customization: | Available |
---|---|
After-sales Service: | Free Parts |
Warranty: | 1year |
Still deciding? Get samples of US$ 1638/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical indexes
|
|||||||||
Model:TP
|
10KW
|
20KW
|
40KW
|
60KW
|
80KW
|
100KW
|
150KW
|
200KW
|
|
Rated capacity
|
10KW
|
20KW
|
40KW
|
60KW
|
80KW
|
100KW
|
150KW
|
200KW
|
|
Operation mode and priciple
|
PWM(pulse width modulation)based on DSP accurate control technology and double built-in MCUs complete isolation of the output power supply
|
||||||||
AC input
|
Three-phase +N+G
|
||||||||
Voltage
|
AC220V/AC380V ±20%
|
||||||||
Frequency
|
50Hz/60Hz ±5%
|
||||||||
DC input
|
DC voltage
|
DC192V/DC220V/DC240V/DC384V(16 to 32 pieces of12V batteries)
|
|||||||
Floating battery
|
13.6V of each battery*battery quantity(13.6V *16 batteries=217.6V)
|
||||||||
Cut-off voltage
|
10.8V of each battery*battery quantity(13.6V *16 batteries=172.8V)
|
||||||||
AC output
|
Phase number
|
Three-phase +N+G
|
|||||||
Voltage
|
AC220V/AC380V ±1%(steady load)
|
||||||||
Frequency
|
50Hz/60Hz ±5%(mains supply),50Hz±0.01%(battery)
|
||||||||
Efficiency
|
≥95%(load:100%)
|
||||||||
Waveform
|
Sine wave
|
||||||||
THD
|
Linear load:<±3%;non-linear load:<5%
|
||||||||
Dynamic load voltage transient
|
<±5%(jump from 0 to 100%)
|
||||||||
Instant recovery time
|
<10ms
|
||||||||
Switching time battery/ mains supply
|
3s--5s
|
||||||||
Unbalanced voltage
|
<±3% <±1%(balanced load voltage)
|
||||||||
overload capacity
|
120%,20s;>150%,100ms
|
||||||||
System indexes
|
Operation efficiency
|
≥95%(load:100%)
|
|||||||
Computer communication interface
|
RS 232/RS 485(SNMP remote monitoring network adapter)
|
||||||||
Operating temperature
|
-10~40ºC
|
||||||||
Relative humidity
|
0~90%ºC(no condensation)
|
Q1: What is the warranty of your product?
A1: Quality warranty for 12 months; parts will be shipped free during warranty period.
Q2: Can you do OEM?
A2: Yes, we can offer the OEM service.
Q3: What is your delivery time?
A3: Within 5 day after receive advanced payment.
Q4: What minimum order do you require?
A4: 1 piece.
Q5: Why choose us?
A5: 1) Prompt delivery and good after-sale services.
2) We have our own factory, the selling prices is competitive.
3) All of our products have CE certification, ISO9001:2008, RoHS.
4) 80% new materials for production and superior quality.
5) Professional engineer designers.
Please contact us for more detail information without hesitate.
Warmly welcome to to vist our factory in Foshan city of China.